Tempino – Plaju oil pipeline development carried out in order to replace the old existing pipe that aged more than 70 years. Additionally, this project also aims to secure the feed oil supply to the RU III Refinery, because the best way to transport the oil is through pipe considering its effectiveness, cost, HSE and social aspects. Oil Volume : 20.000 BOPD Production Period : 10 years Pipe Length : 267 km Pipe Size : 6 inch and 8 inch Location : Tempino – Ramba segments, which start from KM 265 to KM 3 On Stream : 2012